{"id":266,"date":"2018-01-25T13:52:48","date_gmt":"2018-01-25T13:52:48","guid":{"rendered":"http:\/\/tele.elva-1.com\/index.php\/2014\/07\/25\/the-day-we-designed-a-new-project\/"},"modified":"2019-05-12T17:48:16","modified_gmt":"2019-05-12T17:48:16","slug":"tppc-10g-e_10_gbps-czech_republic","status":"publish","type":"post","link":"http:\/\/tele.elva-1.com\/index.php\/2018\/01\/25\/tppc-10g-e_10_gbps-czech_republic\/","title":{"rendered":"PPC-10G-E 10 Gbps Link Installed in Kop\u0159ivnice, Czech Republic"},"content":{"rendered":"<section class=\"section  text-normal section-text-no-shadow section-inner-no-shadow section-normal section-opaque\"  >\n    \n    <div class=\"background-overlay grid-overlay-0 \" style=\"background-color: rgba(0,0,0,0);\"><\/div>\n\n    <div class=\"container container-vertical-default\">\n        <div class=\"row vertical-default\">\n            <div class=\"col-md-12     text-default small-screen-default\"  ><div class=\"col-text-1 text-normal  element-top-20 element-bottom-20\" data-os-animation=\"none\" data-os-animation-delay=\"0s\">\n    <p><span style=\"color: #000000;\">Kop\u0159ivnice Moravian-Silesian Region, Czech Republic \u2014 Jan 25, 2018 \u2014 ELVA-1 Company has announced successful installation of PPC-10G-E ultra-high throughput millimeter wave link for Teranet, local telecom operator by RGMT Group, ELVA\u2019s partner. The link works at E-band 71-76\/81-86 GHz, which is lightly licensed frequency band in Czech Republic.<\/span><\/p>\n<p><!--more--><\/p>\n<p>This PPC-10G-E link is intended to work on distance of 3442 m (1.86 miles) within Teranet backbone network. City of Kop\u0159ivnice is known as well-established industrial point: steel, engineering, and automotive industries are strong here. The Tatra truck company is also based here. Teranet backbone network has massive wireless presence at the area with radios of many brands, while ELVA PPC-10G-E is the first one to bring true 10 GE wireless connectivity.<\/p>\n<p>David Jal\u016fvka from Teranet has commented the link installation \u2014 \u201cWith modern demand for 10 GE connectivity from our customers, we have chosen ELVA 10 Gbps radio to speed-up of setting 10 Gigabit Ethernet connection between out towers at cities of Kop\u0159ivnice\u00a0<a href=\"https:\/\/maps.google.com\/?q=%C5%A0trambersk%C3%A1+483,+742+58+P%C5%99%C3%ADbor,+%C2%A0%C4%8Cesko&amp;entry=gmail&amp;source=g\">and P\u0159\u00edbor<\/a>. The trace is installed over suburb area with agriculture fields, local roads and small watercourses which are barriers for fiber digging. \u00a0\u00a0We have run a series of tests and can confirm stable 10 Gbps duplex wireless channel at 3.44 km distance\u201d.<\/p>\n<p>Krasimir Zabadanov from RGMT Group has mentioned about their experience with PPC-10G-E link \u2014 \u201cThe place of installation is within area with often rains and fog, which has to be considered as negative factor for E-band wireless communications. The precipitation statistics shows that the number of days with rain or sometimes snow is varying from 6 to 11 days at every month all the year. For PPC-10G-E we are delighted with link budget, 10 GE throughput and connection uptime even at rain conditions. This is the first equipment of such top class we used to work with at RGMT. As overall review, equipment advantages are very simple assembly, excellent guidance and tuning system with measuring units, supply of connectors, good throughput values in case of unfavorable weather conditions, which by default suppress this frequency\u201d.<\/p>\n<p>PPC-10G-E is IP radio link, providing 10 Gbps full-duplex throughput at E-band. The link is intended for point-to-point applications such as 4G\/LTE\/5G Backhaul, Corporate Campus Networks, IPTV, and other Wireless ISP backbones. All ELVA-1 links are designed for interconnection between remote WAN\/LAN segments that located on the sites with no fixed line broadband connection. Typically, this is for landscape or industrial barriers or ecology restrictions for ground cable laying like national park, river, lake, airport\/railway area, private land, etc.<\/p>\n<\/div>\n<\/div>        <\/div>\n    <\/div>\n<\/section>\n\n","protected":false},"excerpt":{"rendered":"<p>Kop\u0159ivnice Moravian-Silesian Region, Czech Republic \u2014 Jan 25, 2018 \u2014 ELVA-1 Company has announced successful installation of PPC-10G-E ultra-high throughput millimeter wave link for Teranet, local telecom operator by RGMT Group, ELVA\u2019s partner. The link works at E-band 71-76\/81-86 GHz, which is lightly licensed frequency band in Czech Republic.<\/p>\n","protected":false},"author":1,"featured_media":589,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"image","meta":[],"categories":[24,1],"tags":[78,75],"_links":{"self":[{"href":"http:\/\/tele.elva-1.com\/index.php\/wp-json\/wp\/v2\/posts\/266"}],"collection":[{"href":"http:\/\/tele.elva-1.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/tele.elva-1.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/tele.elva-1.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/tele.elva-1.com\/index.php\/wp-json\/wp\/v2\/comments?post=266"}],"version-history":[{"count":3,"href":"http:\/\/tele.elva-1.com\/index.php\/wp-json\/wp\/v2\/posts\/266\/revisions"}],"predecessor-version":[{"id":591,"href":"http:\/\/tele.elva-1.com\/index.php\/wp-json\/wp\/v2\/posts\/266\/revisions\/591"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/tele.elva-1.com\/index.php\/wp-json\/wp\/v2\/media\/589"}],"wp:attachment":[{"href":"http:\/\/tele.elva-1.com\/index.php\/wp-json\/wp\/v2\/media?parent=266"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/tele.elva-1.com\/index.php\/wp-json\/wp\/v2\/categories?post=266"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/tele.elva-1.com\/index.php\/wp-json\/wp\/v2\/tags?post=266"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}